Project: Rail Operating Centres (ROC) Works
Location: Three Bridges, Manchester, York, Rugby, Romford and Basingstoke
Start: 2012
Completion: Ongoing
Works: External / Internal fibre and copper installation and associated route works including:

  • Survey of cable routes and existing infrastructure with NR
  • Assisting with design of cable routes 
  • Planning – booking line blocks, worksites in possessions and providing all SSoW planning functions
  • Route Works – including veg / ballast clearance, trough installation (approx. 3000m for the above), buried duct routes, STAKKAbox’s, Cable Trunking, GRP on posts, Cable Tray etc
  • External / Internal Fibre and Copper Cabling 
  • Installation of Floor and Wall Mounted ODF (Optical Distribution Frames)
  • Installation of Floor and Wall Mounted MDF (Main Distribution Frames)
  • Fibre / Copper JTT (Jointing, terminating and testing) – including planning possessions and undertaking disconnections on live networks.
  • As Built – including FTN spreadsheet for OTDR, ILM etc

Project: FTNx
Location: UK
Start: 2013
Completion: 2015
Works: Fibre Cabling / Route works including:

  • Survey of cable routes and existing infrastructure with NR
  • Planning – booking line blocks, worksites in possessions and providing all SSoW planning functions
  • Route Works – including veg / ballast clearance, trough installation (approx. 3000m for the above), buried duct routes, STAKKAbox’s, Cable Trunking, GRP on posts, Cable Tray etc
  • External / Internal Fibre cabling 
  • Installation of Wall Mounted ODF (Optical Distribution Frames)
  • Fibre JTT (Jointing, terminating and testing) – including planning possessions and undertaking disconnections on live networks.
  • As Built – including FTN spreadsheet for OTDR, ILM etc